Charging vs discharging headroom on a battery storage capacity map
How to read the charging and discharging layers on a battery storage hosting capacity map: why they differ, which one limits the site, what hours the map assumed, and what it leaves out.
-
How often utilities refresh their capacity maps
How often utility capacity maps change, why one map can mix layers on different refresh cycles, and how to find the date of the figure you're using before you quote.
-
How to check EV charging capacity at a site before you quote
How to check published EV charging load capacity at a site before you quote: which map to open, which feeder serves the site, how to compare your load, and why the map's date matters.
-
What goes into a substation capacity figure
Why aggregation methods, shared equipment constraints and assessment dates matter when comparing sites.
-
Electrification headroom vs EV headroom
Why the same feeder can have different capacity estimates for different types of load.
-
What a public map can and cannot answer before you ask
What published capacity maps can support in site screening, and what requires a project-specific utility answer.
-
Reading negative capacity values
What a negative published capacity estimate does—and does not—establish.
-
When an MVA label does not mean you should convert to MW
Published capacity fields need to be interpreted using the utility’s methodology, not a default power-factor assumption.
-
Hosting capacity maps vs distribution load serving capacity maps
Why generation hosting estimates and load-serving estimates answer different assessment questions.
-
ConEd queue records
What ConEd’s shared queue numbers represent.
-
Developer alternatives if capacity is unavailable
When capacity is unavailable, developers can turn to storage, behind-the-meter generation, or waiting.
-
N-1 and N-2 contingencies
How utilities size equipment to survive losing a transformer, and how that loss is priced in.
-
Transformer emergency ratings, LTE and STE loading
How long a transformer can run above its normal rating before the overload becomes a cost to the equipment's lifespan.
-
Distribution interconnection queues
How distribution interconnection backlog differs from transmission-level.
-
Disclosure rules vs data quality
A comparison of how California, New York, and New Jersey require utilities to disclose hosting capacity data.
-
Utility capital plans for capacity upgrades
How rate cases move a capacity constraint from a utility's load forecast into a funded infrastructure project.
-
Rate case docket numbers
How to find and read a rate case docket.
-
Binding tariffs and voluntary hosting capacity maps
The difference in legal weight between a tariff, a rate case outcome, and a utility's voluntary hosting capacity map.
-
NEMA, IEEE, UL, and ANSI
What these standards actually require and their legal weight.
-
Vertically integrated investor owned utilities vs co-ops
How ownership structure determines how much a utility answers to its state regulator.
-
Hosting capacity disclosure mandates
History of hosting-capacity disclosure requirements in California, Illinois, and Minnesota.
-
How equipment ratings are used to determine capacity
Thermal limits and contingency margin that determine capacity ceilings.
-
Single-phase, two-phase, and three-phase feeders
How feeder-level capacity numbers can hide phase imbalance.
-
Pole top, pad mounted transformers
The layers of equipment between a substation and the transformer that serves a building.
-
What a short capacity history can establish
Why a short record history cannot establish a physical capacity trend or a statistical margin of error.
-
Immutable historical records, slowly changing dimension
Why overwriting a corrected data point erases information that used to be true.
-
Incident response and status page design
How AWS and the EIA each handle telling customers whether a fix is retroactive.
-
Six utilities, six front doors
Where a new-load request starts at National Grid, Central Hudson, O&R, Con Edison, UI and CMP.
-
Preparing a useful utility capacity inquiry
The location, load profile and service date a utility needs to assess a request, and the documents required as it progresses.
-
What a utility response establishes—and what remains unresolved
How to distinguish preliminary capacity feedback, study results, cost estimates and service agreements when assessing a project.
-
Who pays for the line
What New York's service rule and the utilities' pages say about cost responsibility.
-
Utility economic development programs
Which utility programs pay for site power, which discount the bill, and when to apply.
-
How long power takes
Published connection timelines, equipment lead times, and the large-load process.
-
Redundant utility feeds: reliability, availability and cost
A second utility feed can reduce exposure to some outages. Its value depends on shared infrastructure, switching arrangements and the utility’s service terms.
-
What a building’s electrical service rating tells you
Amps, voltage and phase describe the existing service. They do not establish spare capacity in the building or additional capacity on the utility network.
-
Connected load, demand, peak and ramp-up
Why the sum of equipment ratings exceeds what a building draws, what load by type means on a form, and why a utility asks when the load arrives.
-
Load form and load letter
What a utility’s load form asks for, how a load letter differs, and how to present the project’s demand and timing.
-
One-line diagrams, riser diagrams and cut sheets
What a one-line diagram, a riser diagram and a cut sheet show, who prepares them, and how a reviewer reads them together.
-
Site plan, stamp, municipal approval and easements
What a site plan and a plot plan are, what a stamp and a municipal approval each mean, why a utility asks for them, and what an easement gives the utility.
-
Electrical capacity and utility service glossary
Electrical capacity and utility service terms, with their implications for site selection and project planning.