Hosting capacity maps vs distribution load serving capacity maps
Why generation hosting estimates and load-serving estimates answer different assessment questions.
A generation hosting-capacity estimate and a load-serving estimate answer different questions. The first concerns additional electricity supplied into the network; the second concerns additional customer demand. A label containing “hosting capacity” does not establish which calculation was performed.
Identify the direction of power flow
A solar assessment may test generation exports when local demand is low. A customer-load assessment may test additional demand alongside an existing peak. Those are examples of assessment conditions, not universal formulas. Storage can require both charging and discharging assessments, and different constraints can bind in each direction.
Read the layer definition and methodology before applying its result. Do not assume that a generation hosting-capacity number establishes room for an industrial load, or that a map intended for EV developers necessarily models a specific charging schedule.
Match the evidence to the proposed project
The Joint Utilities of New York's undated discussion draft on map use distinguishes the applications and limits of its map products. It provides context for screening; it does not establish a parcel's connection terms.
A site comparison should identify the metric type, unit, utility source date and not-comparable flag. Where the utility supplies no date, print “no utility-reported source date.” Under this site's comparison rule, only load_serving_headroom in MW is eligible for comparison across utilities, and compatible dates, equipment and operating conditions still need to be established.
Generation hosting capacity, EV hosting capacity and electrification headroom remain distinct metrics. MVA values also remain distinct from MW. This article contains no per-record utility capacity values. Use the glossary's utility-data labels when interpreting records and take unresolved methodology questions to the utility before drawing a project conclusion.
The first site check is free. Send an address.