- From
- Site Watch <capacity-updates@sitewatch.example>
- To
- Example Road Project Team <project-team@example-road.example>
- Subject
- Site watch: published capacity changed near 100 Example Road
Example Utility's April 15 map refresh showed less published summer load-serving headroom on Example Feeder 12, near your site at 100 Example Road.
- Before: 2.4 MW in the April 8, 2026 map capture.
- After: 0.9 MW in the April 15, 2026 map capture.
Your four 150 kW chargers draw 600 kW at full power, which still fits under the published 0.9 MW figure. A second phase of the same size would put the total above that figure.
This is not a capacity study; confirm with the utility before you commit.
We check the maps weekly. To stop this watch, reply to this email and ask us to stop watching 100 Example Road.