Demand scenarios

Enter an added peak demand in MW and compare it with the published figures near each site in a batch. It is arithmetic on published numbers where the metric allows it, not an assessment of whether a connection is possible.

Illustrative example. Utilities, records and values are synthetic, not utility data.

SitePublished figure+2 MW+5 MW+10 MW
1. 100 Example Road12.5 MW load-serving headroom10.5 MW left7.5 MW left2.5 MW left
2. 25 Sample Avenue3.2 MW EV hosting capacityNot comparedNot comparedNot compared

Site 2 is not compared because an EV hosting figure does not describe general load-serving capacity. The utility still decides what a site can take.

See it in a demo

I’ll run it live on your own sites and walk through what each record means. Tell me a little about the sites you’re looking at.

Request a demo