Demand scenarios
Enter an added peak demand in MW and compare it with the published figures near each site in a batch. It is arithmetic on published numbers where the metric allows it, not an assessment of whether a connection is possible.
Illustrative example. Utilities, records and values are synthetic, not utility data.
| Site | Published figure | +2 MW | +5 MW | +10 MW |
|---|---|---|---|---|
| 1. 100 Example Road | 12.5 MW load-serving headroom | 10.5 MW left | 7.5 MW left | 2.5 MW left |
| 2. 25 Sample Avenue | 3.2 MW EV hosting capacity | Not compared | Not compared | Not compared |
Site 2 is not compared because an EV hosting figure does not describe general load-serving capacity. The utility still decides what a site can take.
See it in a demo
I’ll run it live on your own sites and walk through what each record means. Tell me a little about the sites you’re looking at.