About

Published grid information can help you prepare questions about a property. I bring those records together in a site brief, explaining what the figures do and don’t show and which questions need an answer from the utility.

Where this data comes from

The records come from utilities’ public data sources. The purpose of each source matters: EV hosting capacity and electrification headroom describe different measures, and neither can be assumed to describe the service available to a particular property.

Why it's hard to use across utilities

Some utilities publish equipment ratings and observed peaks at substation level. Other substation figures are sums of feeder values, which may share an upstream equipment limit. Keeping the metric definition and units alongside a figure helps you decide which questions it raises.

What this actually does

The brief brings published observations together with source links and the dates available for each record. Changes between dated observations can raise questions for the utility; the records alone cannot establish the cause or whether the physical network has changed.

Diagram of a substation's rated capacity, connected load, load that's approved but not yet connected, and remaining headroom RATED CAPACITY OF THE SUBSTATION CONNECTED ALREADY DRAWING LOAD APPROVED NOT YET CONNECTED HEADROOM WHAT'S LEFT OVER
This illustration shows headroom after connected and approved load are subtracted from a rating. Each utility’s published measure and planning assumptions need to be read separately.

Data quality

Coverage varies, and some sources go months without an update. A snapshot date is not the source date; some sources provide only a run date, leaving the age of the underlying information unknown. The data quality and corrections page records source-specific limits and corrections.

The example brief shows how published records lead to questions about a site. The tools, shown in a demo on request, work from the same records, and the API documentation describes their fields.

The utility needs to confirm serving equipment, connection requirements, costs and timing for a project. Nearby published records can help you prepare that inquiry.


I’m Ash Wang. Send the site address and what you’re trying to find out to ash@substationcapacity.com, and we can discuss a brief and access to the tools.